Tight-access bobcats to larger excavators, plus tippers - sites cleared, levelled and ready to build on, no matter how steep or awkward the access.
Mini excavators and skid steers sized to get up a slope or through a narrow gate.
Pools and structures broken up and cleared, site backfilled and compacted after.
Broken up with a rock-breaker attachment and cleared, then backfilled and compacted ready for what comes next. Pools can be removed completely or filled in, depending on access and what you have planned for the space.
Trenching to fall and depth, sites cut and levelled ready for the next trade.
A 3-tier retaining wall and garden bed, Wahroonga. Before the soil, mulch and planting went in, the agi-pipe drainage behind the wall was run and backfilled with gravel - giving the water somewhere to go so it doesn't build up pressure on the wall or cause damage down the line.
Cutting and reinforcing a retaining wall footing on a steep sloped block, with precast junction pits set into the trench as part of the site's drainage.
One of the most common issues we're asked to address is water and drainage. This Killara property had a serious amount of water coming from the house next door, affecting the client's side paths and foundations - left unaddressed, that causes real problems down the track. We built council-specified timber and block retaining walls, and the water is now caught with agi-pipe, gravel, strip drains and pits.
Trenching to fall and depth, sites cut and levelled ready for the next trade.
Excavators, skid steers and tippers working on golf course sites, with the machinery sized to protect the fairways and greens.

A lot of the Upper North Shore is steep, narrow-access blocks - the kind of site a standard excavator can't reach. We run mini excavators and skid steers sized to get up a slope, along a side path or through a narrow gate, and still move real volumes of material.
On multi-machine jobs we bring excavators and skid steers on site together so cutting, carting and levelling happen in the same pass rather than waiting on each other.

Pool removal, old paving and structures are broken up and cleared on site, with the hole backfilled and compacted ready for whatever's planned next - new landscaping, a deck, or just usable lawn again.
Access is what decides how long a pool removal takes, and the rules differ between councils, so please check your local council's regulations before we start.

Stormwater and drainage lines are trenched to fall and depth before anything gets covered back over, and building sites are cut and levelled to spec before the next trade moves in.
Because excavation sits alongside our landscape and plumbing divisions, drainage, retaining and services are planned in before the first bucket goes in the ground - not worked around afterwards.
We check access, ground conditions and services before quoting.
Levels, drainage and retaining planned in with the trades that follow.
Machinery matched to the site, spoil removed by tipper.
Site left cleared and levelled for the next trade.
Tell us about access and what's planned afterwards - we'll come back with a quote.